Some of major thing must be achieved before constructing the building structural is the structural base. The sort of building foundation are all raft foundation, floor foundation, piling foundation. Ordinarily earlier assemble a building, we want to inspect soil state for this building. It can be done manually by carried out soil investigation(SI). The study of SI document may be used for establish form of base.

Like a consulting scientist, it’s going to be often that engineer should prepare RC drawings for the client. Client need it for amounts purpose. Ordinarily, SI will carry out at the next stage i.e. after the earthworks completion zemní práce Praha.

As a outcome, how can consulting engineer to perform preliminary assortment of foundation?

Preliminary range of foundation might be based on the earthworks foundations. A easy way is speaking to the trim and fill area within earthworks foundations. Wherever cut space can select as pad foundation and fulfill area will probably select as pile foundation. When fill area is less than 1.2m, it can be used as base foundation because floor require a particular depth for construct.

Another process of determination is on site excavation,
engineer

should visit site to see that the ground state. Engineer can observe how a excavator excavate earths. Will the excavator can effortless remove the dirt. Can dirt is unfastened at vertical sides of excavation hole. If the reply is YES, then ground remains soft. It can be recommended touse heap groundwork else mat base can be advocated.